Search Results

Refine Results:

Waterfront Toronto Green Building Requirements (GBR) Version 3.0 - January 2021

Search/Meta description
This document represents Version 3 (January 2021) of the Waterfront Toronto Green Building Requirements (GBR) (previously MGBR).
View PDF

Appendix 16: 2015 Dockwall Structural Assessment Lower Don Lands (Riggs)

Design Review Panel Meeting Presentation - Port Lands Flood Protection River Valley and Parks Design – Detailed Design (DRAFT) - April 18, 2018

Design Review Panel Presentation - Cherry Street Lakefilling Project (DRAFT) (April 19, 2017)

Design Review Panel Meeting Presentation - Port Lands Flood Protection and Enabling Infrastructure (DRAFT) - January 24, 2018

Terms of Reference for Don Mouth Naturalization and Port Lands Flood Protection Project (June 2006)

Presentation (Design Team) - Port Lands Flood Protection Community Consultation - February 22, 2018

Design Review Panel Meeting Presentation - Port Lands Flood Protection Parks, River and Roads (DRAFT) - September 26, 2018

Appendix 1: Lower Don River Due Diligence and Validation Report (MVVA)

Don Mouth Naturalization and Port Lands Flood Protection Environmental Assessment Executive Summary