Search Results

Refine Results:

Waterfront Toronto Rolling Five-Year Strategic Plan 2021/22 - 2025/26

Waterfront Toronto Integrated Annual Report 2019-20

Search/Meta description
The theme of this inaugural integrated report for 2019-2020 is Resilient Waterfront, Resilient Toronto. As we live and grow through these unprecedented times, we recognize that, now more than ever
View PDF

Waterfront Toronto Green Building Requirements (GBR) Version 3.0 - January 2021

Search/Meta description
This document represents Version 3 (January 2021) of the Waterfront Toronto Green Building Requirements (GBR) (previously MGBR).
View PDF

Transportation Master Plan Environmental Assessment - Lower Yonge (August 7, 2014)

Urban Design Report Principles and Recommendations - Lower Yonge (August 2014)

Lower Yonge Precinct EA - Environmental Study Report (May 2018)

Lower Yonge Precinct Final Staff Report (April 28, 2016)

Lower Yonge Precinct - Public Information Centre Consultation Summary (June 23, 2016)

Lower Yonge Precinct EA - Appendix I: Public Information Centre Summary Report and Displays (May 2018)