Construction Notice #68: Port Lands Flood Protection & Lake Shore Boulevard East Projects
May 2026
Construction Manager: EllisDon
Construction Notice: Road Closure
Lake Shore Boulevard East – Overnight Lane Reductions and DVP Ramp Closures for Final Paving Work
Over the next two weeks, overnight work will take place on Lake Shore Boulevard East to complete final top-layer asphalt paving, marking the last stage of the roadworks.
Work will occur nightly between 9:00 PM and 5:00 AM. During this time, one lane in each direction will remain open at all times. Paving will be completed one direction at a time, while the opposite direction remains fully open.
In addition, there will be two overnight closures of the Lake Shore Boulevard East / Don Valley Parkway (DVP) on/off ramps between Wednesday, May 13 and Friday, May 15, from 9:00 PM to 5:00 AM. The specific closure nights will be confirmed based on weather conditions.
Traffic Adjustments:
Lake Shore Boulevard East
- Overnight lane reductions will be in place.
- One lane in each direction will remain open at all times.
- Work will occur in one direction at a time to maintain traffic flow.
Lake Shore / DVP On/Off Ramps
- Two overnight closures of select Lake Shore Boulevard East and DVP on/off ramps will occur between May 13–15 (exact nights to be confirmed).
- Closures will take place between 9:00 PM and 5:00 AM only.
- The DVP mainline will remain fully open at all times.
Daytime Impacts
- No impact during daytime hours.
- All lanes and ramps will reopen each morning before peak travel periods.
Pedestrian & Cyclist Access
- Sidewalks and multi-use paths will remain open and accessible throughout the work.
Safety and Management
To ensure the safety of workers and the public:
- Traffic control measures and signage will be in place.
- Please follow all posted signage and directions from on-site personnel.
Questions?
To learn more about this project, please visit the Lake Shore Boulevard East Project Webpage.
To send us questions or concerns about construction, use this online inquiry form. You can also email us at plfp@ellisdon.com.
For urgent construction related issues, please contact Kevin Cassar, EllisDon, at 647-388-7310.