Question 1:

Are there specific qualifications or experience required of the marine engineer?

 

Answer 1:

The selected artist must use a qualified marine engineer licensed to practice in Ontario. Stamped construction drawings will be required prior to fabrication.

 

Question 2:

Is Waterfront Toronto able to provide or recommend contacts for any marine engineers?

 

Answer 2:

To maintain a fair and impartial procurement process, Waterfront Toronto cannot recommend specific engineers or provide a preferred list.

 

Question 3:

What is the expected scope of marine engineering for the project? Should the marine engineer’s scope include the anchoring and tethering system and stamped construction drawings only, or should it also include engineering review of the artwork itself, such as wind loading, buoyancy and stability?

 

Answer 3:

The scope of marine engineering will depend on the proposed artwork. Marine engineering and marine structure design should consider the feasibility of the floating artwork, relevant loads and anchoring requirements and, depending on the concept, may also include consideration of the artwork’s structural performance and stability under site conditions.

 

At the proposal stage, engineered or construction drawings are not required. Applicants should provide sufficient information to describe the proposed approach and demonstrate its feasibility, and include a separate budget line for stamped marine engineering and marine structure design. A conservative estimate is sufficient at this stage.

 

Question 4:

Are artists required to budget for signage, marketing or public relations materials as part of the project? If so, what materials are required, and what costs should artists anticipate?

 

Answer 4:

Waterfront Toronto will lead and cover the costs of its standard marketing and public relations activities for the project, including required on-site signage.

 

Any additional or specialized signage, marketing, promotional or public relations materials proposed by the artist team beyond Waterfront Toronto’s standard project activities must be included in the artist team’s project budget. All such materials and activities are subject to prior review and approval by Waterfront Toronto’s Communications team.

 

Question 5:

Can an individual Canadian artist apply as the lead artist and engage Ontario-based engineering and fabrication contractors following selection, or must these contractors be identified at the proposal stage?

 

Answer 5:

Yes. An individual Canadian artist may apply as the lead artist. Ontario-based engineering and fabrication contractors do not need to be formally committed at the proposal stage. However, the proposal should demonstrate a feasible approach to fabrication, engineering, installation and removal, with appropriate allowances for these components included in the project budget.

 

Question 6:  

Are preliminary engineering and fabrication cost estimates sufficient at the proposal stage, with stamped engineering drawings and final technical specifications to be developed following selection?

 

Answer 6:

Preliminary engineering and fabrication cost estimates are sufficient at the proposal stage. Engineered or construction drawings are not required as part of the submission. If selected, the final engineering, anchoring system and stamped construction drawings will be developed with the appropriate technical specialists prior to fabrication.  

As outlined in the RFP, Ontario-based contractors must be used for new fabrication or adaptation undertaken for this opportunity, and the use of local subcontractors is strongly encouraged.

 

Question 7:

Are artists based outside Canada eligible to apply for the 2027 Floating Public Art opportunity?

 

If eligible, can international artists engage Ontario-based contractors or consultants to support the development, fabrication and installation of their proposed artwork, and is Waterfront Toronto able to provide or recommend contacts?

 

Answer 7:

The call is open to professional artists and artist teams based in Canada. As part of the submission, applicants are required to complete the Business Location Attestation Form in Appendix E of the RFP to confirm their eligibility. Applicants should review the eligibility requirements and Appendix E carefully to determine whether they meet the requirements.

 

For the development and fabrication of the artwork, the RFP requires the use of Ontario-based contractors and strongly encourages the use of local subcontractors. For any new fabrication or adaptation undertaken specifically for this opportunity, Ontario-based contractors must be used.

 

Artists are responsible for researching and identifying the fabricators, contractors and technical specialists they wish to work with. To maintain a fair and impartial procurement process, Waterfront Toronto cannot recommend specific companies or provide a preferred list.

 

Question 8:

Are artists responsible for providing and budgeting for all equipment required to install and remove the artwork, such as boats or other marine equipment, or will any installation equipment be provided by Waterfront Toronto?  

 

If artists are responsible, can Waterfront Toronto recommend local suppliers?

 

Answer 8:

The artist team is responsible for providing and covering the cost of all equipment and marine services required for installation and removal, including any required boat and qualified operator. These costs should be included in the proposed project budget. The RFP recommends allowing approximately $10,000 CAD, plus contingency, for installation and removal.

 

To maintain a fair and impartial procurement process, Waterfront Toronto cannot recommend specific suppliers or contractors during the RFP process. Ontario-based engineers are required, and the use of local subcontractors is strongly encouraged. The artist team is responsible for procuring these services and confirming the supplier’s suitability, availability, insurance and safety requirements.

 

Waterfront Toronto will assist the selected artist in connecting with the relevant authorities for work in the water and facilitating the necessary permitting processes.

 

Question 9:

Section 2.2.3 references $2 million in liability insurance and $5 million in commercial general liability insurance for water installations. Are these separate insurance requirements, or does the $2 million requirement form part of the $5 million coverage?

 

For budgeting purposes at the proposal stage, what should applicants include in their insurance allowance? Should preliminary estimates account for the waterborne artwork, installation and removal activities, seasonal maintenance, and any required additional-insured coverage or endorsements?

 

Answer 9:

For proposal-stage budgeting, the CDN $5 million requirement is the minimum Commercial General Liability (CGL) coverage required of the selected artist. It is not intended to be added to a separate CDN $2 million general liability policy. An umbrella or excess liability policy may be used to reach the CDN $5 million limit.

 

The separate CDN $2 million requirement applies to professional liability (errors and omissions) insurance for applicable consultants, such as engineers. It is not a water-installation endorsement within the CGL policy. Where the proposed work requires engineering or other professional consulting services, the proposal-stage insurance allowance should account for this coverage.

 

For budgeting purposes, artists should obtain a preliminary insurance estimate that reflects the anticipated scope and risk profile of the project, including, as applicable:

  • a waterborne artwork installed in Harbour Square Park Basin;
  • fabrication, transportation, installation, seasonal maintenance and removal;
  • work undertaken by contractors or subcontractors;
  • CGL coverage of at least CDN $5 million, maintained from commencement of services through complete removal of the artwork;
  • the additional insured parties identified in the RFP and agreement;
  • all-risk coverage for the artwork and related materials, including while in storage, fabrication or transit, up to the full contract value;
  • all-risk property insurance for contractors’ equipment, property and materials;
  • automobile liability of at least CDN $1 million, where applicable;
  • professional liability of at least CDN $2 million per occurrence for applicable consultants; and
  • WSIB compliance, where applicable.

The selected artist’s final insurance policies will also be required to meet the detailed conditions of the agreement. Final insurance documentation and confirmation of coverage will be reviewed prior to the commencement of services.

This clarification is provided to support a reasonable proposal-stage budget allowance only and does not constitute approval of a proposed design or confirmation that a particular insurance quotation or policy will satisfy the final contractual requirements.

 

Question 10:

What bathymetric, lakebed or geotechnical information is available for Harbour Square Park Basin, and are there established water-level ranges or wind and wave design criteria that applicants should consider when budgeting for marine engineering?

 

If additional site or lakebed information is required to finalize the anchoring design, will the selected artist be responsible for arranging any necessary investigation, testing or anchor-holding verification following selection?

 

Answer 10:

Waterfront Toronto does not currently have additional bathymetric, lakebed or geotechnical records beyond the information included in Appendix A and the RFP addenda. The basin is approximately four to five metres deep at its centre, with approximately three feet of soft sediment. The information in Appendix A is based on a May 2019 substrate and depth check undertaken when water levels were higher than average.

 

Project-specific wind and wave design criteria have not been prescribed at the proposal stage. Artists should include an allowance for stamped marine engineering and marine structure design in the project budget.

 

Following selection, the selected artist’s qualified marine engineer, licensed to practice in Ontario, will be responsible for establishing the applicable design criteria and determining whether additional lakebed investigation or anchor-holding verification is required. Any necessary investigation, engineering, anchoring, installation and removal costs should be included in the overall project budget.

 

Question 11:

Can a Canadian artist submit a collaborative proposal with a U.S.-based creative partner? Would eligibility differ if the U.S.-based party is a named co-artist or collaborator versus a paid consultant or subcontractor?

 

Answer 11:

A Canadian artist may include a U.S.-based artist, architecture/design practice or other creative professional on the broader project team, provided the Canadian artist is the applicant and contracting party with Waterfront Toronto and meets the eligibility requirements of the RFP.

 

A U.S.-based practice may also be retained by the Canadian artist as a design or creative consultant or subcontractor. Whether the U.S.-based party is described as a “co-artist” or “creative partner” does not determine eligibility; what matters is the legal and contractual structure of the proposed team. If the U.S.-based party forms part of the applicant or contracting entity, Waterfront Toronto cannot confirm eligibility in advance. The proposed arrangement must satisfy the eligibility requirements of the RFP, including the Business Location Attestation requirements.

 

Waterfront Toronto does not prescribe or recommend a preferred team structure. Applicants are responsible for determining the composition and contractual structure of their project teams and ensuring compliance with all applicable RFP requirements, including those related to Ontario-based contractors and professional services.

 