Search Results

Refine Results:

Waterfront Toronto Integrated Annual Report 2019-20

Search/Meta description
The theme of this inaugural integrated report for 2019-2020 is Resilient Waterfront, Resilient Toronto. As we live and grow through these unprecedented times, we recognize that, now more than ever
View PDF

Waterfront Toronto Green Building Requirements (GBR) Version 3.0 - January 2021

Search/Meta description
This document represents Version 3 (January 2021) of the Waterfront Toronto Green Building Requirements (GBR) (previously MGBR).
View PDF

Waterfront Toronto Annual Report - 2018-19

Presentation - Portland Slip Water's Edge Promenade - June 9, 2011

Presentation - Portland Slip Water's Edge Promenade - November 17, 2010

Presentation - Portland Slip Water's Edge Scope and Concept Design

Design Review Panel Meeting Presentation - Eireann Quay Ireland Park Foundation Building (DRAFT) - March 25, 2020

Waterfront Toronto Rolling Five-Year Strategic Plan 2021/22 - 2025/26