Web Content Viewer (JSR 286)
- ${title}
Loading...
Annual Reports

Waterfront Toronto is continually adding new documents online. To view a list of documents, starting with the most recent, select a category on the right.
- Lake Shore Boulevard East Public Realm Vision, Phasing and Implementation Plan - Appendix B - Gardiner Expressway Maintenance Access Study (February 2020)
- Lake Shore Boulevard East Public Realm Vision, Phasing and Implementation Plan - Appendix A - Stormwater Management Report (February 2020)
- Lake Shore Boulevard East Public Realm Vision, Phasing and Implementation Plan (February 2020)
- Broadview and Eastern Flood Protection Project - Notice of Public Information Centre 1 - December 5, 2018
- Notice of Commencement of Environmental Assessment - Broadview and Eastern Flood Protection Project - September 20, 2018
- Lower Yonge Precinct EA - Notice of Study Completion - May 31, 2018
- Lower Yonge Precinct EA - Environmental Study Report (May 2018)
- Lower Yonge Precinct EA - Appendix N - Cost Estimate Breakdown (May 2018)
- Lower Yonge Precinct EA - Appendix M - Construction Phasing (May 2018)
- Lower Yonge Precinct EA - Appendix L - Utility Conflicts and Relocation Plan Memo (May 2018)
- Lower Yonge Precinct EA - Appendix K - Transportation Modelling Memo (May 2018)
- Lower Yonge Precinct EA - Appendix J - Freeland Street - Revised Alternatives (May 2018)
- Lower Yonge Precinct EA - Appendix I - Public Information Centre Summary Report and Displays (May 2018)
- Lower Yonge Precinct EA - Appendix H - Consultation Record (May 2018)
- Lower Yonge Precinct EA - Appendix G - Heritage Inventory and Heritage Impact Assessments (May 2018)
- Lower Yonge Precinct EA - Appendix F - Inventory of Archaeological Resources (May 2018)
- Lower Yonge Precinct EA - Appendix E - Noise Memo (May 2018)
- Lower Yonge Precinct EA - Appendix D - Air Quality Screening Assessment (May 2018)
- Lower Yonge Precinct EA - Appendix C - Phase I Environmental Site Assessment (May 2018)
- Lower Yonge Precinct EA - Appendix B - Drainage Memo (May 2018)
- Lower Yonge Precinct EA - Appendix A - Natural Environment Memo and Tree Inventory (May 2018)
- Port Lands and South of Eastern - Transportation and Servicing Master Plan Environmental Assessment - Appendices
- Port Lands and South of Eastern - Transportation and Servicing Master Plan Environmental Assessment
- Gardiner East EA Report - Chapter 7 - Summary of Consultation (Updated April 2017)
- Gardiner East EA Report - Chapter 6 - Description of Undertaking Effects Assessment (Updated April 2017)
- Gardiner East EA Report - Chapter 4 - Description and Evaluation of Alternative Solutions (Updated April 2017)
- Gardiner East EA Report - Chapter 3 - Description of Potentially Affected Environment (Updated April 2017)
- Gardiner East EA - Associated with Appendix H - Air Quality and Greenhouse Gas Assessment Report (Updated April 2017)
- Gardiner East EA - Associated with Appendix D - Archaeological Stage 1 Report (Updated April 2017)
- Gardiner East EA - Associated with Appendix C - Cultural Heritage Resource Assessment Report (Updated April 2017)
- Gardiner East EA - Appendix B - Record of Consultation Appendix (Updated April 2017)
- Notice of Submission of Gardiner East Environmental Assessment (January 27, 2017)
- Gardiner East EA Report - Executive Summary (January 2017)
- Gardiner East EA Report - Chapters 1 and 2 - Introduction, Purpose and Rational of the Undertaking (January 2017)
- Gardiner East EA Report - Chapter 9 - Conclusions and Next Steps (January 2017)
- Gardiner East EA Report - Chapter 8 - EA Amendment Procedures (January 2017)
- Gardiner East EA Report - Chapter 7 - Summary of Consultation (January 2017)
- Gardiner East EA Report - Chapter 6 - Description of Undertaking Effects Assessment (January 2017)
- Gardiner East EA Report - Chapter 5 - Design Alternatives (January 2017)
- Gardiner East EA Report - Chapter 4 - Description and Evaluation of Alternative Solutions (January 2017)
- Gardiner East EA Report - Chapter 3 - Description of Potentially Affected Environment (January 2017)
- Gardiner East EA Report - Appendix T - Hybrid Construction Staging Report (August 2014) - January 27, 2017
- Gardiner East EA Report - Appendix R - Third Party Proposals Assessment (February 2016)
- Gardiner East EA Report - Appendix Q - Economic Competitiveness Study Report (May 2015)
- Gardiner East EA Report - Appendix P - Goods Movement Study Report (May 2015)
- Gardiner East EA Report - Appendix O - Costing Assumptions (September 2016)
- Gardiner East EA Report - Appendix N - Case Study Report (March 2009)
- Gardiner East EA Report - Appendix M - Economics Baseline Conditions Report (2014)
- Gardiner East EA Report - Appendix L - Urban Design, Public Realm and Socio-Economic Baseline Conditions Report (2014)
- Gardiner East EA Report - Appendix K - Transportation Modelling Report (November 2016)
- Gardiner East EA Report - Appendix J - Infrastructure Baseline Conditions Report (2014)
- Gardiner East EA Report - Appendix I - Noise Assessment Report (January 2017)
- Gardiner East EA Report - Appendix H - Air Quality and Greenhouse Gas Impact Assessment Report (November 2016)
- Gardiner East EA Report - Appendix G - Stormwater Baseline Conditions Report (2014)
- Gardiner East EA Report - Appendix F - Geo-Environmental Baseline Conditions Report (2014)
- Gardiner East EA Report - Appendix E - Natural Environment Baseline Conditions Report (2014)
- Gardiner East EA Report - Appendix D - Archaeological Baseline Conditions Report (2014)
- Gardiner East EA Report - Appendix C - Cultural Heritage Baseline Conditions Report (2014)
- Gardiner East EA Report - Appendix B - Record of Consultation (Report) (January 2017)
- Gardiner East EA Report - Appendix B - Record of Consultation (Appendix) (January 2017)
- Gardiner East EA Report - Appendix A - Terms of Reference (September 2009)
- Gardiner East EA - Voluntary Review of the Draft EA Report from July 21, 2016 to September 6, 2016 - Summary of Participant Feedback (January 2017)
- Gardiner East EA Report - Appendix U - Land Valuation Report (February 2016)
- Gardiner East EA Report - Appendix S - Road Safety Review (February 2016)
- Environmental Study Report - The Bentway (Project Under Gardiner) Municipal Class Environmental Assessment - January 16, 2017
- Notice of Completion of Environmental Study Report - Project Under Gardiner Pedestrian and Cycling Bridge Crossing, Fort York Blvd (January 16, 2017)
- Project Under Gardiner - Consultation Summary and Public Feedback Report (August 19, 2016)
- Gardiner East EA - Draft EA Report - All Chapters (July 2016)
- FAQ - In response to June 23, 2016 Lower Yonge Municipal Class EA meeting material
- Lower Yonge Precinct - Public Information Centre Consultation Summary (June 23, 2016)
- Display Boards - Lower Yonge Precinct Public Information Centre (19MB) (June 23, 2016)
- Backgrounder - Lower Yonge Precinct Update (June 23, 2016)
- Project Under Gardiner - Walking Workshop Notes - June 22, 2016
- Project Under Gardiner - Walking Workshop Notes - June 2, 2016
- Presentation - Project Under Gardiner Public Information Centre 2
- Display Boards - Project Under Gardiner Environmental Assessment Public Meeting 2
- Project Under Gardiner - Stakeholder Advisory Committee Meeting 3 - Design Workshop - Comments
- Project Under Gardiner - Stakeholder Advisory Committee Meeting 3 - Design Workshop - Presentation
- Project Under Gardiner - Walking Workshop Notes - May 8, 2016
- Project Under Gardiner - Walking Workshop Notes - April 10, 2016
- Presentation - Project Under Gardiner Public Information Centre 1
- Display Boards - Project Under Gardiner Public Information Centre 1 - Environmental Assessment
- Display Boards - Project Under Gardiner Public Information Centre 1 - Programming
- Display Boards - Project Under Gardiner Public Information Centre 1 - Design Framework
- Display Boards - Project Under Gardiner Public Information Centre 1 - Context
- Project Under Gardiner - Stakeholder Advisory Committee Meeting 2 - Presentation
- Project Under Gardiner - Stakeholder Advisory Committee Meeting 2 - Minutes and Summary Report
- Notice of Study Commencement - Project Under Gardiner Municipal Class Environmental Assessment
- Gardiner East EA - Round Five Consultation Report (February 2016)
- Gardiner East EA - Public Forum 5 - Presentation (January 19, 2016)
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 10 Summary (January 14, 2016)
- Project Under Gardiner - Stakeholder Advisory Committee Meeting 1 - Minutes and Summary Report
- Presentation - Project Under Gardiner Framework Plan for Stakeholder Advisory Committee
- Call for Members - Project Under Gardiner Stakeholder Advisory
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 9 Summary (October 20, 2015)
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 8 Summary (September 1, 2015)
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 7 Summary (July 21, 2015)
- Summary Report - Lower Yonge Public Meeting 3 (June 23, 2015)
- Presentation - Pinnacle 1-7 Yonge Street (June 23, 2015)
- Presentation - Lower Yonge Public Meeting (June 23, 2015)
- Lower Yonge Project Update - June 2015
- Agenda and Worksheet - Lower Yonge Public Meeting (June 23, 2015)
- Study Area Map - Lower Yonge Precinct Transportation Master Plan Municipal Class Environmental Assessment (May 21, 2015)
- Gardiner Expressway East Public Meeting Notice - 04-15-2015
- Gardiner East EA - Public Forum 4 - Presentation (April 15, 2015)
- Gardiner East EA - Remove and Hybrid Alternative Options - Additional Graphics (April 2015)
- Gardiner East EA - Backgrounder - Remove Option (April 2015)
- Gardiner East EA - Backgrounder - Hybrid Option (April 2015)
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 6 Summary (April 13, 2015)
- Gardiner East EA - Round Four Consultation Report (April 2015)
- Gardiner East EA - Round Two Consultation Report (November 2013)
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 5b Summary (October 9, 2014)
- Notice of Filing - Addendum and Completion of Environmental Study Report for the 2014 Lower Don Lands Environmental Assessment Master Plan Addendum and ESR
- Lower Don Lands Environmental Assessment Master Plan Addendum and Environmental Study Report (46 MB)
- Waterfront Sanitary Sewer Servicing Master Plan
- Urban Design Report Principles and Recommendations - Lower Yonge
- Transportation Master Plan Environmental Assessment - Lower Yonge
- Urban Design Report Principles and Recommendations - Lower Yonge (August 7, 2014)
- Transportation Master Plan Environmental Assessment - Lower Yonge (August 7, 2014)
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 5 Summary (June 17, 2014)
- Presentation - Gardiner Expressway East Public Meeting 3
- Gardiner East EA - Public Forum 3 - Presentation (February 6, 2014)
- Gardiner East EA - Round Three Consultation Report (February 2014)
- Gardiner East EA - Preliminary Evaluation Results Matrix (February 2014)
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 4 Summary (February 4, 2014)
- Port Lands Planning Framework Map and Transportation and Servicing Master Plan- Municipal Class Environmental Assessment Map
- Don Mouth Naturalization and Port Lands Flood Protection Project - Notice Of Pre-Submission
- Ontario Place Revitalization - Project overview
- Ontario Place Revitalization - Environmental Assessment
- Gardiner East EA - Draft Evaluation Criteria (November 2013)
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 3 Summary (October 29, 2013)
- Presentation - Gardiner Expressway East Public Meeting 2
- Gardiner East EA - Public Forum 2 - Presentation (October 16, 2013)
- Summary Report - Lower Yonge Public Meeting 2
- Presentation - Lower Yonge Public Meeting 2
- Feedback Sheet - Lower Yonge Public Meeting 2
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 2 Summary (October 1, 2013)
- Presentation - Don Mouth and Lower Don Lands Environmental Assessments Public Meeting
- Notice of Filing Addendum - West Don Lands Class EA Master Plan Stormwater Quality Revision
- Notice of Filing Addendum - East Bayfront Class EA Master Plan Stormwater Quality Revision
- Lower Don Lands and Don Mouth EA Public Meeting Summary Report
- Display Boards - Don Mouth Naturalization and Port Lands Flood Protection Public Meeting (July 24, 2013)
- Backgrounder - Don Mouth and Lower Don Lands Environmental Assessments Public Meeting
- Agenda or Worksheet - Don Mouth and Lower Don Lands Environmental Assessments Public Meeting
- Addendum to West Don Lands Class EA Master Plan for Stormwater Quality
- Addendum to East Bayfront Class EA Master Plan for Stormwater Quality
- Gardiner East EA - Round One Consultation Report (July 2013)
- Gardiner East EA - Public Forum 1 - Presentation (June 13, 2013)
- Gardiner Expressway East Study Area
- Gardiner East EA - Stakeholder Advisory Committee (SAC) Meeting 1 Summary (May 28, 2013)
- Summary Report - Lower Yonge Public Meeting
- Presentation - Lower Yonge Urban Design Guidelines (20MB)
- Presentation - Lower Yonge Transportation Master Plan
- Presentation - Lower Yonge Precinct Plan Process
- Presentation - Lower Yonge Precinct Introduction
- Agenda - Lower Yonge Public Meeting
- Report to Toronto Council - Gardiner Expressway Rehabilitation Project (March 28, 2013)
- Report to Toronto City Council - Gardiner East EA (March 28, 2013)
- Don Mouth Naturalization and Port Lands Flood Protection Environmental Assessment Executive Summary
- Final Notice of Submission Don Mouth Naturalization and Port Lands Flood Protection Environmental Assessment
- Gardiner East EA - Design Ideas Competition Brief (June 25, 2010)
- Gardiner East EA - Design Ideas - REPLACE by West 8 and DTAH and Cecil Balmond AGU - Booklet (June 25, 2010)
- Gardiner East EA - Design Ideas - REPLACE by West 8 and DTAH and Cecil Balmond AGU - Boards (June 25, 2010)
- Gardiner East EA - Design Ideas - REPLACE by Adrian Smith and Gordon Gill Architecture - Booklet (June 25, 2010)
- Gardiner East EA - Design Ideas - REPLACE by Adrian Smith and Gordon Gill Architecture - Boards (June 25, 2010)
- Gardiner East EA - Design Ideas - REMOVE by Office for Metropolitan Architecture - Booklet (June 25, 2010)
- Gardiner East EA - Design Ideas - REMOVE by Office for Metropolitan Architecture - Boards (June 25, 2010)
- Gardiner East EA - Design Ideas - REMOVE by James Corner Field Operations - Booklet (June 25, 2010)
- Gardiner East EA - Design Ideas - REMOVE by James Corner Field Operations - Boards (June 25, 2010)
- Gardiner East EA - Design Ideas - IMPROVE by Kuwabara Payne McKenna Blumberg and Bjarke Ingels Group - Booklet (June 25, 2010)
- Gardiner East EA - Design Ideas - IMPROVE by Kuwabara Payne McKenna Blumberg and Bjarke Ingels Group - Boards (June 25, 2010)
- Gardiner East EA - Design Ideas - IMPROVE by Diller Scofidio and Renfro and Architects Alliance - Booklet (June 25, 2010)
- Gardiner East EA - Design Ideas - IMPROVE by Diller Scofidio and Renfro and Architects Alliance - Boards (June 25, 2010)
- Presentation - Lower Don Lands Executive Council Committee
- Lower Don Lands Infrastructure Master Plan and Keating Channel Precinct ESR Main Report 23 MB
- Lower Don Lands Infrastructure Master Plan and Keating Channel Precinct ESR Appendices 60 MB
- Notice of Filing Addendum for West Don Lands Class Environmental Assessment Master Plan
- Addendum to West Don Lands Class Environmental Assessment for Stormwater Quality Facility
- Notice of Completion of Environmental Study Report for the East Bayfront Transit Environmental Assessment
- East Bayfront Transit Environmental Assessment Environmental Study Report - Executive Summary
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix D - First Nations Correspondence
- East Bayfront Transit Environmental Assessment Environmental Study Report
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix K - Noise and Vibration Assessment
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix E Functional Plan of Preferred Design
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix I -Traffic Assessment
- Queens Quay Revitalization EA Environmental Study Report
- Notice of Completion of ESR for Queens Quay Revitalization EA
- Appendix I - Central Waterfront Secondary Plan
- Appendix E - Transit and Traffic Operations Analysis Report
- Appendix A - Queens Quay EA Consultation Report Appendices
- Appendix A - Queens Quay EA Consultation Report - December 2009
- Notice of Filing Addendum - Revisions to East Bayfront Class Environmental Assessment Master Plan - Stormwater Management System Revision
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix M - Geotechnical Assessment
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix N -Heritage Assessment
- East Bayfront Class Environmental Assessment Master Plan Addendum - Stormwater Management System Revision
- Appendix B - City of Toronto Council Minutes
- Appendix B - City of Toronto Council Decision
- Appendix D - Staff Report - Appendix 6
- Appendix D - Staff Report - Appendix 5
- Appendix D - Staff Report - Appendix 4
- Appendix D - Staff Report - Appendix 3
- Appendix D - Staff Report - Appendix 2
- Appendix D - Staff Report - Appendix 1
- Appendix D - Staff Report
- Appendix C - Staff Report to Executive Committee - Appendix 3
- Notice of Submission - Gardiner East Terms of Reference
- Gardiner Environmental Assessment Terms of Reference
- Gardiner Environmental Assessment Record of Consultation - Terms of Reference Stage
- Gardiner Environmental Assessment EA Terms of Reference
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix J - Redpath Partial Signal Operations Analysis
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix H -Design Alternatives Analysis
- Appendix C - City of Toronto Amended Committee Recommendations
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix O -Potential Utility Conflicts
- Appendix C - Staff Report to Executive Committee - Appendix 6
- Appendix C - Staff Report to Executive Committee - Appendix 5
- Appendix C - Staff Report to Executive Committee - Appendix 4
- Appendix C - Staff Report to Executive Committee - Appendix 2
- Appendix C - Staff Report to Executive Committee - Appendix 1
- Appendix C - Staff Report to Executive Committee
- Workbook - Lower Don Lands EA, Keating Channel Precinct Plan and Don Mouth EA Public Meeting
- Summary Report - Lower Don Lands EA Public Meeting 3
- Presentation - Lower Don Lands EA, Keating Channel Precinct Plan and Don Mouth EA Public Meeting
- Notice of Lower Don Lands EA, Keating Precinct Plan and Don Mouth EA Public Forum
- HANDOUT - Lower Don Lands EA, Keating Channel Precinct Plan and Don Mouth EA Public Meeting
- DISPLAY BOARDS - Lower Don Lands EA, Keating Channel Precinct Plan and Don Mouth EA Public Meeting
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix C4 - Technical Advisory Committee Meeting March 2009
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix L - Archaeological Assessment
- Notice of Gardiner Expressway and Lake Shore Blvd. Reconfiguration EA Public Forum 1 (Etobicoke, Scarborough, Toronto, North York)
- Backgrounder Public Consultation Process
- Case Studies - Future of the Gardiner Expressway Environmental Assessment and Urban Design Study
- Workbook - Queens Quay EA and East Bayfront Transit EA Public Forum 3
- Presentation - Queens Quay Revitalization EA and East Bayfront Transit EA Public Forum 3
- Display Panels - Queens Quay Revitalization EA
- Display Panels - Queens Quay Illustrative Plan
- Display Panels - East Bayfront Transit EA
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix B7 - Community Liaison Committee Meeting 7 March 11, 2009
- Meeting Summary - Queens Quay Environmental Assessment Stakeholder Advisory Committee Meeting - March 11, 2009
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix B6 - Community Liaison Committee Meeting 6 March 2, 2009
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix A3 - Public Information Centre 3 Summary Report March 2009 (Part 2)
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix A3 - Public Information Centre 3 Summary Report March 2009 (Part 1)
- Appendix H - Environmental Management Plan
- Workbook - Lower Don Lands EA Public Meeting 2
- Summary Report - Lower Don Lands EA Public Meeting 2
- Presentation - Lower Don Lands EA Public Meeting 2
- Presentation - Lower Don Lands EA Public Meeting 2 (full screen slides)
- HANDOUTS Lower Don Lands EA Public Meeting 2
- Display Panels - Lower Don Lands EA Public Meeting 2
- Workbook - Queens Quay Revitalization EA Public Meeting 2
- Summary Report - Queens Quay Revitalization EA Public Meeting 2
- Presentation - Queens Quay Revitalization EA Public Meeting 2
- Display Panels - Queens Quay Revitalization EA Public Meeting 2
- Presentation - Queens Quay Revitalization EA Stakeholder Advisory Committee Meeting 3
- Meeting Summary - Queens Quay Environmental Assessment Stakeholder Advisory Committee Meeting - November 27, 2008
- Workbook - Lower Don Lands EA Public Meeting 1
- Summary Report - Lower Don Lands EA Public Meeting 1
- Presentation - Lower Don Lands EA Public Meeting 1
- Display Panels - Lower Don Lands EA Public Meeting 1
- Notice of Study Commencement - Lower Don Lands Municipal Class EA and Keating North Precinct Plan
- Lower Don Lands EA Study Area Map
- Appendix 4 - LEED for Neighbourhood Development Pilot Rating System
- Appendix 3 - Waterfront Toronto Mandatory Green Building Requirements
- Appendix 2 - Sustainability Framework Progress Reporting Checklist
- Appendix 1 - Sustainability Framework
- West Don Lands Transit Environmental Assessment Environmental Study Report
- Notice of Completion of Environmental Study Report for West Donlands Transit EA
- Appendix F - Stage 1 Archaeological Resource Assessment
- Workbook - Queens Quay Revitalization EA Public Meeting 1
- Summary Report - Queens Quay Revitalization EA Public Meeting 1
- Presentation - Queens Quay Revitalization EA Public Meeting 1
- Problem Statement and Phase 2 Alternative Planning Solutions
- Presentation - Queens Quay Revitalization EA Stakeholder Advisory Committee Meeting 2B
- Meeting Summary - Queens Quay Environmental Assessment Stakeholder Advisory Committee Meeting - December 11, 2007
- TTC Staff Report for West Don Lands Transit Environmental Assessment
- West Don Lands Transit Environmental Assessment Environmental Study Report - Appendix F
- West Don Lands Transit Environmental Assessment Environmental Study Report - Appendix H
- Summary Report - Queens Quay Revitalization EA Stakeholder Advisory Committee Meeting 2
- Presentation - Queens Quay Revitalization EA Stakeholder Advisory Committee Meeting 2
- West Don Lands Transit Environmental Assessment Environmental Study Report - Appendix G
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix C3 - Technical Advisory Committee Meeting September 2007
- Summary Report - Queens Quay Revitalization EA Stakeholder Advisory Committee Meeting 1
- Presentation - Queens Quay Revitalization EA Stakeholder Advisory Committee Meeting 1
- Notice of Study Commencement - Queens Quay Revitalization EA
- Presentation - Central Waterfront Stakeholder Advisory Committee Meeting - Part II
- Presentation - Central Waterfront Stakeholder Advisory Committee Meeting - Part I
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix G -Planning Alternatives Analysis
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix C2 - Technical Advisory Committee Meeting June 2007
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix A2 - Public Information Centre 2 Summary Report June 2007 (Part 2)
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix A2 - Public Information Centre 2 Summary Report June 2007 (Part 1)
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix B5 - Community Liaison Committee Meeting 5 May 29, 2007
- West Don Lands Transit Environmental Assessment Environmental Study Report - Appendix D
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix B4 - Community Liaison Committee Meeting 4 May 3, 2007
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix C1 - Technical Advisory Committee Meeting March 2007 (Part 2)
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix C1 - Technical Advisory Committee Meeting March 2007 (Part 1)
- West Don Lands Transit Environmental Assessment Environmental Study Report - Appendix C
- West Don Lands Transit Environmental Assessment Environmental Study Report - Appendix A
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix B3 - Community Liaison Committee Meeting 3 March 2007
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix A1 - Public Information Centre 1 Summary Report March 2007 (Part 2)
- Demand Forecasting for the Waterfront EA Addendum
- Letter of Approval from the Minister of the Environment
- FINAL TTC-TWRC Waterfront Transit EAs Terms of Reference (ToR) - West Don Lands - Amended
- FINAL TTC-TWRC Waterfront Transit EAs Terms of Reference (ToR) - Port Lands - Amended
- FINAL TTC-TWRC Waterfront Transit EAs Terms of Reference (ToR) - East Bayfront - Amended
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix B2 - Community Liaison Committee Meeting 2 January 2007
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix B1 - Community Liaison Committee Meeting 1 December 2006
- West Don Lands Transit Environmental Assessment Environmental Study Report - Appendix B
- Notice of East Bayfront Precinct Plan Update and Class Environmental Assessment Public Information Centre
- Appendix G - Quay to the City Summary Report
- Notice of Submission - Terms of Reference for Waterfront Transit EAs
- West Don Lands Transit Environmental Assessment Environmental Study Report - Appendix E
- TTC - TWRC Waterfront Transit Environmental Assessments - Terms of Reference Consultation Record - Complete with Appendices
- East Bayfront Transit Environmental Assessment Environmental Study Report - Appendix F -Demand Forecasting for the Waterfront Environmental Assessment
- Demand Forecasting for the TTC - TWRC Waterfront Transit Environmental Assessments
- TTC - TWRC Waterfront Transit Environmental Assessments - Draft ToR Evaluation Criteria
- Terms of Reference for Don Mouth Naturalization and Port Lands Flood Protection Project
- TTC - TWRC Waterfront Transit Environmental Assessments Draft Terms of Reference (ToR)
- TTC - TWRC Waterfront Transit Environmental Assessments - Terms of Reference Comments Form
- The EA Process - a guide
- Map of Transit Study Area
- Notice of Study Completion - East Bayfront Class Environmental Assessment Master Plan
- East Bayfront Class Environmental Assessment Master Plan
- Class Environmental Assessment and West Don Lands Soil and Ground Water Risk Assessment
- Notice of Completion of Environmental Study Report for the Western Beaches Watercourse Facility
- Western Beaches Watercourse - Coordinated Environmental Assessment (80MB)
- West Don Lands Class Environmental Assessment Master Plan - March 2005
- West Don Lands Class Environmental Assessment Master Plan - Figures
- West Don Lands Class Environmental Assessment Master Plan - Appendices
- Lower Don River West Remedial Flood Protection Project Class Environmental Assessment - Environmental Study Report
- Western Beaches Watercourse Facility Project Description
- West Don Lands Public Consultation Summary Report
- Summary Report - West Don Lands Public Forum 3
- Summary Report - East Bayfront Public Forum 3
- Summary Report - West Don Lands Public Forum 2
- Summary Report - West Don Lands Public Forum 1
- Summary Report - Wast Bayfront Public Forum 2
- East Bayfront Precinct Planning Environmental Assessment Study Guide
- Summary Report - East Bayfront Public Forum 1
-
Board Meeting Materials
-
Design Review Panel Materials
-
Digital Strategy Advisory Panel Meeting Materials
-
Public Notice
-
Plans Proposals Reports Strategies and Studies
-
Meeting Materials
-
Environmental Assessment Materials
-
News Release Archive
-
Design Competition Materials
-
Presentations
-
Sustainability
-
Procurement
-
Annual Reports
-
Financial Statements
-
Policies
-
Expenses
-
Employment Opportunities
-
Queens Quay East Interim Improvements
-
Queens Quay Construction Notices
-
Queens Quay Construction Liaison Committee (CLC)
-
West Don Lands Construction Liaison Committee (CLC)
-
Martin Goodman Trail Construction Notices
-
Newsletters