hostname= wps01dev.waterfront.com

Express Web Content Viewer (JSR 286)

Actions
Loading...

queens quay (east)

Toronto’s main waterfront street is being transformed into a showpiece for the city.

 

Queens Quay is the main east-west thoroughfare along the waterfront and as such, it will be the "main street" for the new East Bayfront community. The new Queens Quay will feature two lanes of east-west traffic on the north side of the street with a dedicated Light Rail Transit (LRT) line in the middle. On the south side, a generous granite mosaic pedestrian promenade defined by a double row of trees will run alongside an off-street Martin Goodman Trail. Businesses and condominiums on the north side of the street will front onto sidewalks with granite curbs and a row of mature trees.

 

Queens Quay will provide the kind of atmosphere conducive to economic vitality, ground floor retail activity and urban vibrancy. It will become an iconic street that is as beautiful as it is functional. This new world-class street will link major destinations along the water’s edge, create pedestrian and cycling-friendly promenades and transform the area into a vibrant destination for locals and visitors alike.

 

the vision for Queens Quay

 

In 2006, Waterfront Toronto launched the Central Waterfront Innovative Design Competition for the central waterfront which included the East Bayfront area. As part of its winning design, West 8 + DTAH proposed a design for Queens Quay that would make it a signature boulevard by reducing the number of lanes of traffic to allow for a generous tree lined pedestrian promenade, cycling connections and much improved landscaping in the area.

 

While Waterfront Toronto was an advocate of the winning design, we fully supported the statutorily-required Class Environmental Assessment (EA) process which had to occur before any work on Queens Quay could begin. Learn more about the Revitalization of Queens Quay EA

 

linking the gap in the Martin Goodman Trail

 

The Martin Goodman Trail, a 56 kilometre multi-use recreational trail, is currently disjoined as it passes through the centre of the city. Waterfront Toronto’s plans for revitalizing Queens Quay will connect the trail. Cyclists will be able to travel along a generous, four metre-wide, off-street Martin Goodman Trail from Lower Spadina Avenue all the way through East Bayfront to Parliament Street where the trail continues along Lake Shore Blvd.

 

learn more

 

bringing transit to east bayfront

 

Learn more about the Environmental Assessment process undertaken to determine the new transit services required for East Bayfront.

 

Read the Environmental Study Report (ESR) to learn more about the evaluation and decision making process used to reach the recommendations of the East Bayfront Transit EA Study.

related news

project status

Schedule:
%
Approved Budget:
spent

quick facts

Design team: West 8 + DTAH

 

Boundaries: From Yonge Street to Parliament Street

 

Length: 1.1 km

 

Width of pedestrian promenade: 6-8 metres (varies)

 

Width of Martin Goodman Trail: 4 metres

 

Proximity: 10 minute walk to Union Station

 

Materials:  2 tone (Canadian red and grey) granite pavers forming maple leaf pattern along promenade.  Grey granite for curbs on streetscapes.

 

Benches: Ipe with red cast aluminum bases featuring maple leaf motif

 

Light pole:  Timber pole with wire brush finish and cast aluminum base with tree bark pattern

Contenido complementario